Wed. Dec 4th, 2024

A3 Business News

A3 News | All business news all over the world.

Stone retaining wall construction in Colorado

3 min read

Cobblestone retaining wall construction in Colorado: Why you should backfill with stone? Versa-Lok recommends compacting the angular stone as you backfill, but check the installation instructions for the type of block you’re using. Backfill about 8 to 10 inches below the top of the capstones. This will allow enough room for the topsoil and turf. Secure the capstones with a specialty landscape block adhesive, which stays flexible over time. Make sure the blocks are dry before applying the adhesive. Overhang the capstones about 1 to 1-1/2 inch. Joe and Jake use a scrap 2×4 as a guide.

NFC can either be mixed on-site for smaller areas or purchased from a reputable concrete supplier and trucked in for larger commercial applications. NFC is mixed at a 6:1 ratio by volume of 20mm max size clean aggregate and cement. Water content should be such that the cement slurry evenly coats the aggregate and retains a wet/glossy appearance without excess slurry running off, this is typically around 40 litres per 100kg of cement. With the use of NFC, we are able to build Block Retaining Walls in areas and situations where normal construction methods would not work. Some of these situations are: In areas where excavation behind the wall is limited either due to being on a boundary or close to other structures or footings.

We also repair existing retaining walls. Many railroad tie walls or older concrete retaining walls which may or may not include rocks or boulders are beginning to show signs of failure. Often times a homeowner will build a DIY retaining wall that needs help after years of service. Colorado Retaining Wall specializes in the building and repair of retaining walls. Whether the wall is for a backyard or driveway of a residence or a commercial Shopping Center, we design and build large block walls for all Earth retention requirements. We have the ability to fortify the wall with shotcrete or soil nails which would include helical tie-backs or micropiles. Nearly every wall we build requires engineering and we have deep relationships with engineers that work hand-in-hand with our foremen regardless of the size of project. Please read our reviews and look and our photo gallery. See even more info on Building and repair of retaining walls Colorado.

No matter if you choose to build your retaining wall out of block, brick, stone, wood or concrete, the goal should be to integrate the retaining wall into your landscape. The angle of a sloping lawn should never be greater than 45 degrees, and the gentler the slope, the better. The higher the wall, the gentler the slope will be. After determining the wall height, check local building codes. Many municipalities require a building permit and an engineer’s approval before a wall higher than 3 feet can be built. For taller projects, some careful engineering is required to construct a sturdy, long-lasting wall.

A wall that leans into the soil it retains is less likely to be pushed outward by soil pressure than a plain-old vertical wall. Design and build your retaining wall to slope at a minimum rate of one inch for every one-foot of rise (height). Fortunately, working with retaining wall blocks makes it incredibly easy to achieve this “step-back” construction! The locking flange on the bottom edge of every block guides it to click into position slightly behind the lower block, preventing the top blocks from being pushed outward.

Copyright © All rights reserved. | Newsphere by AF themes.